OR Queue Project OCS114 — Solar in Josephine, Oregon
OR Queue Project OCS114 — Solar in Josephine, Oregon is a 3.0 MW solar interconnection project in Josephine, Oregon with a current status of active. It is proposed to connect at Circuit 5R52 Cave Junction Substation.
3.0 MWCapacity
ActiveStatus
ORMarket
SolarTechnology
Project facts
| Canonical name | OR Queue Project OCS114 — Solar in Josephine, Oregon |
|---|---|
| Queue ID | OCS114 |
| Status | active |
| Source status | In Progress |
| Market | OR |
| Technology | Solar |
| Capacity | 3.0 MW |
| State | Oregon |
| County | Josephine |
| Point of interconnection | Circuit 5R52 Cave Junction Substation |
| Requested (queue) date | 2026-07-23 |
| Proposed in-service date | 2027-12-01 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | PacifiCorp |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-17 | new_project | — | active | high |
Explore related data
Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27
Provenance: pacificorp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata