OR Queue Project PIS079 — Battery in Morrow, Oregon

OR Queue Project PIS079 — Battery in Morrow, Oregon is a 199.9 MW battery interconnection project in Morrow, Oregon with a current status of withdrawn. It is proposed to connect at Boardman - Hemingway transmission line.

199.9 MWCapacity
WithdrawnStatus
ORMarket
BatteryTechnology

Project facts

Canonical nameOR Queue Project PIS079 — Battery in Morrow, Oregon
Queue IDPIS079
Statuswithdrawn
Source statusWithdrawn
MarketOR
TechnologyBattery
Capacity199.9 MW
StateOregon
CountyMorrow
Point of interconnectionBoardman - Hemingway transmission line
Requested (queue) date2024-06-14
Proposed in-service date2028-10-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerPacifiCorp

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-28

Provenance: pacificorp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata