OR Queue Project PIS100 — Solar+Battery in Crook, Oregon

OR Queue Project PIS100 — Solar+Battery in Crook, Oregon is a 80.0 MW solar+battery interconnection project in Crook, Oregon with a current status of active. It is proposed to connect at Ponderosa Substation.

80.0 MWCapacity
ActiveStatus
ORMarket
Solar+BatteryTechnology

Project facts

Canonical nameOR Queue Project PIS100 — Solar+Battery in Crook, Oregon
Queue IDPIS100
Statusactive
Source statusIn Progress
MarketOR
TechnologySolar+Battery
Capacity80.0 MW
StateOregon
CountyCrook
Point of interconnectionPonderosa Substation
Requested (queue) date2025-11-07
Proposed in-service date2026-05-30
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerPacifiCorp

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_project—activehigh

Explore related data

Source last checked2026-11-23
Data last materially changed2026-11-23
Page data generated2026-11-26

Provenance: pacificorp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata