OR Queue Project PIS104 — Solar+Battery in Umatilla, Oregon
OR Queue Project PIS104 — Solar+Battery in Umatilla, Oregon is a 80.0 MW solar+battery interconnection project in Umatilla, Oregon with a current status of active. It is proposed to connect at Roundup substation.
80.0 MWCapacity
ActiveStatus
ORMarket
Solar+BatteryTechnology
Project facts
| Canonical name | OR Queue Project PIS104 — Solar+Battery in Umatilla, Oregon |
|---|---|
| Queue ID | PIS104 |
| Status | active |
| Source status | In Progress |
| Market | OR |
| Technology | Solar+Battery |
| Capacity | 80.0 MW |
| State | Oregon |
| County | Umatilla |
| Point of interconnection | Roundup substation |
| Requested (queue) date | 2025-11-07 |
| Proposed in-service date | 2026-06-15 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | PacifiCorp |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-03 | new_project | — | active | high |
Explore related data
Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-28
Provenance: pacificorp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.