OR Queue Project PIS109 — Solar+Battery in Morrow, Oregon
OR Queue Project PIS109 — Solar+Battery in Morrow, Oregon is a 399.8 MW solar+battery interconnection project in Morrow, Oregon with a current status of active. It is proposed to connect at Maverick substation.
399.8 MWCapacity
ActiveStatus
ORMarket
Solar+BatteryTechnology
Project facts
| Canonical name | OR Queue Project PIS109 — Solar+Battery in Morrow, Oregon |
|---|---|
| Queue ID | PIS109 |
| Status | active |
| Source status | In Progress |
| Market | OR |
| Technology | Solar+Battery |
| Capacity | 399.8 MW |
| State | Oregon |
| County | Morrow |
| Point of interconnection | Maverick substation |
| Requested (queue) date | 2026-02-24 |
| Proposed in-service date | 2028-12-31 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | PacifiCorp |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-03 | new_project | — | active | high |
Explore related data
Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27
Provenance: pacificorp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata