Orange & Rockland Storage LDG-00165 (LDG-00165)

Orange & Rockland Storage LDG-00165 is a 3.0 MW battery interconnection project in Rockland, New York with a current status of operational. It is proposed to connect at Stony Point / 45-5-13.

3.0 MWCapacity
OperationalStatus
RamapoMarket
BatteryTechnology

Project facts

Canonical nameOrange & Rockland Storage LDG-00165
Queue IDLDG-00165
Statusoperational
Source statusInterconnected
MarketRamapo
TechnologyBattery
Capacity3.0 MW
StateNew York
CountyRockland
Point of interconnectionStony Point / 45-5-13
Requested (queue) date
Proposed in-service date
Operational date2020-12-22
Withdrawn date
Developer
Utility / transmission ownerOrange & Rockland

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-05new_projectoperationalhigh

Explore related data

Source last checked2026-08-05
Data last materially changed2026-08-05
Page data generated2026-08-28

Provenance: ny-storage. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata