Orange Grove (65891_TALPV)

Orange Grove is a 131.0 MW solar interconnection project in Jim Wells, Texas with a current status of operational.

131.0 MWCapacity
OperationalStatus
ERCOMarket
SolarTechnology

Project facts

Canonical nameOrange Grove
Queue ID65891_TALPV
Statusoperational
Source status(OP) Operating
MarketERCO
TechnologySolar
Capacity131.0 MW
StateTexas
CountyJim Wells
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2025-06-01
Withdrawn date
Developer
Utility / transmission ownerOrange Grove Energy LP

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata