Orchard Ray BESS (25INR0394)

Orchard Ray BESS is a 51.9 MW other interconnection project in Bee, Texas with a current status of operational. It is proposed to connect at 8590 Tuleta 138kV.

51.9 MWCapacity
OperationalStatus
BeeMarket
OtherTechnology

Project facts

Canonical nameOrchard Ray BESS
Queue ID25INR0394
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketBee
TechnologyOther
Capacity51.9 MW
StateTexas
CountyBee
Point of interconnection8590 Tuleta 138kV
Requested (queue) date2023-06-07
Proposed in-service date
Operational date2027-05-01
Withdrawn date
DeveloperPettus BESS
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata