ORDWAY ENERGY STORAGE (FKA OCEANSIDE BESS) (1180)

ORDWAY ENERGY STORAGE (FKA OCEANSIDE BESS) is a 50.0 MW battery interconnection project in San Diego, California with a current status of withdrawn. It is proposed to connect at New substations San Luis-Melrose 69 kV.

50.0 MWCapacity
WithdrawnStatus
Market
BatteryTechnology

Project facts

Canonical nameORDWAY ENERGY STORAGE (FKA OCEANSIDE BESS)
Queue ID1180
Statuswithdrawn
Source statusWITHDRAWN
Market
TechnologyBattery
Capacity50.0 MW
StateCalifornia
CountySan Diego
Point of interconnectionNew substations San Luis-Melrose 69 kV
Requested (queue) date2015-04-30
Proposed in-service date
Operational date
Withdrawn date2016-03-03
Developer
Utility / transmission ownerSDGE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata