OSITO ENERGY (1861)

OSITO ENERGY is a 300.0 MW solar+battery interconnection project in Placer, California with a current status of withdrawn. It is proposed to connect at Rio Oso-Atlantic 230 kV/Rio Oso-Gold Hill 230 kV.

300.0 MWCapacity
WithdrawnStatus
Market
Solar+BatteryTechnology

Project facts

Canonical nameOSITO ENERGY
Queue ID1861
Statuswithdrawn
Source statusWITHDRAWN
Market
TechnologySolar+Battery
Capacity300.0 MW
StateCalifornia
CountyPlacer
Point of interconnectionRio Oso-Atlantic 230 kV/Rio Oso-Gold Hill 230 kV
Requested (queue) date2021-04-15
Proposed in-service date
Operational date
Withdrawn date2022-11-29
Developer
Utility / transmission ownerPGAE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata