Osprey Combined Cycle is a 637.0 MW gas interconnection project in Polk, Florida with a current status of active. It is proposed to connect at Osprey Substation.

637.0 MWCapacity
ActiveStatus
FLMarket
GasTechnology

Project facts

Canonical nameOsprey Combined Cycle
Queue ID027048
Statusactive
Source statusOperation
MarketFL
TechnologyGas
Capacity637.0 MW
StateFlorida
CountyPolk
Point of interconnectionOsprey Substation
Requested (queue) date2014-11-26
Proposed in-service date2024-06-02
Operational date
Withdrawn date
DeveloperOsprey Combined Cycle
Utility / transmission ownerDuke Energy Progress

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: duke-def-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata