Ot516G (Q26-LG-3-30)
Ot516G is a 516.8 MW gas interconnection project in El Paso County, Texas with a current status of active. It is proposed to connect at Otero 345 kV Substation.
516.8 MWCapacity
ActiveStatus
TXMarket
GasTechnology
Project facts
| Canonical name | Ot516G |
|---|---|
| Queue ID | Q26-LG-3-30 |
| Status | active |
| Source status | — |
| Market | TX |
| Technology | Gas |
| Capacity | 516.8 MW |
| State | Texas |
| County | El Paso County |
| Point of interconnection | Otero 345 kV Substation |
| Requested (queue) date | 2026-03-30 |
| Proposed in-service date | 2029-12-31 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | El Paso Electric Company |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-03 | new_project | — | active | high |
Explore related data
Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27
Provenance: epe-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata