Other_ (J3876)

Other_ is a 150.0 MW solar interconnection project in Lapeer, Michigan with a current status of withdrawn. It is proposed to connect at Other_.

150.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameOther_
Queue IDJ3876
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity150.0 MW
StateMichigan
CountyLapeer
Point of interconnectionOther_
Requested (queue) date2025-02-06
Proposed in-service date2030-09-30
Operational date2030-09-30
Withdrawn date2025-12-31
Developer
Utility / transmission ownerITC MIDWEST

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata