Lapeer County, Michigan — Interconnection Projects
The interXdata warehouse tracks 9 interconnection projects in Lapeer, Michigan, representing 1,148 MW of requested capacity.
9Total projects
0Active
5Operational
4Withdrawn
1,148 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Solar | 6 | 698 MW |
| Wind | 2 | 400 MW |
| Battery | 1 | 50 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| BENNET - GREENWOOD 120.0kV | J3866 | Wind | 300.0 MW | operational | Lapeer, Michigan |
| Imlay Pump 120kV Substation | J1661 | Solar | 200.0 MW | withdrawn | Lapeer, Michigan |
| Other_ | J3472 | Solar | 200.0 MW | operational | Lapeer, Michigan |
| Other_ | J3876 | Solar | 150.0 MW | withdrawn | Lapeer, Michigan |
| MISO Queue Project J601 — Wind in Lapeer, Michigan | J601 | Wind | 100.0 MW | withdrawn | Lapeer, Michigan |
| Other_ | J3828 | Solar | 100.0 MW | operational | Lapeer, Michigan |
| Other_ | J3875 | Battery | 50.0 MW | withdrawn | Lapeer, Michigan |
| Demille Solar Farm | 60346_1 | Solar | 28.4 MW | operational | Lapeer, Michigan |
| Turrill Solar Farm | 60347_1 | Solar | 19.6 MW | operational | Lapeer, Michigan |
Top developers
Developer attribution is not yet resolved for this set.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-28
Page data generated2026-08-28
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); Lawrence Berkeley National Laboratory — Queued Up interconnection dataset; MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Get an alert when a new project is proposed in Lapeer County.
Start tracking with interXdata