Other_ (J3952)

Other_ is a 395.0 MW solar interconnection project in Polk, Minnesota with a current status of withdrawn. It is proposed to connect at Other_.

395.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameOther_
Queue IDJ3952
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity395.0 MW
StateMinnesota
CountyPolk
Point of interconnectionOther_
Requested (queue) date2025-02-26
Proposed in-service date2030-06-01
Operational date2030-06-01
Withdrawn date2026-01-02
Developer
Utility / transmission ownerOtter Tail Power Company

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata