Other_ (J4082)
Other_ is a 500.0 MW battery interconnection project in Jefferson, Arkansas with a current status of operational. It is proposed to connect at Other_.
500.0 MWCapacity
OperationalStatus
—Market
BatteryTechnology
Project facts
| Canonical name | Other_ |
|---|---|
| Queue ID | J4082 |
| Status | operational |
| Source status | Active |
| Market | — |
| Technology | Battery |
| Capacity | 500.0 MW |
| State | Arkansas |
| County | Jefferson |
| Point of interconnection | Other_ |
| Requested (queue) date | 2025-10-07 |
| Proposed in-service date | 2030-06-30 |
| Operational date | 2030-06-30 |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | ENTERGY ARKANSAS |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-29 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata