Otter 138kV (GEN-2026-PR3)

Otter 138kV is a 49.7 MW wind interconnection project in Garfield County, Oklahoma with a current status of withdrawn. It is proposed to connect at Otter 138kV.

49.7 MWCapacity
WithdrawnStatus
OKMarket
WindTechnology

Project facts

Canonical nameOtter 138kV
Queue IDGEN-2026-PR3
Statuswithdrawn
Source statusWITHDRAWN
MarketOK
TechnologyWind
Capacity49.7 MW
StateOklahoma
CountyGarfield County
Point of interconnectionOtter 138kV
Requested (queue) date2025-12-01
Proposed in-service date2030-12-01
Operational date
Withdrawn date2026-06-10
Developer
Utility / transmission ownerOG&E

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.