Oxy Renewable Energy - Goldsmith (63388_SOLAR)

Oxy Renewable Energy - Goldsmith is a 16.8 MW solar interconnection project in Ector, Texas with a current status of operational.

16.8 MWCapacity
OperationalStatus
ERCOMarket
SolarTechnology

Project facts

Canonical nameOxy Renewable Energy - Goldsmith
Queue ID63388_SOLAR
Statusoperational
Source status(OP) Operating
MarketERCO
TechnologySolar
Capacity16.8 MW
StateTexas
CountyEctor
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2020-05-01
Withdrawn date
Developer
Utility / transmission ownerOxy Renewable Energy LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.