P L Bartow (634_4DGT)

P L Bartow is a 208.2 MW gas interconnection project in Pinellas, Florida with a current status of operational.

208.2 MWCapacity
OperationalStatus
FPCMarket
GasTechnology

Project facts

Canonical nameP L Bartow
Queue ID634_4DGT
Statusoperational
Source status(OP) Operating
MarketFPC
TechnologyGas
Capacity208.2 MW
StateFlorida
CountyPinellas
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2009-06-01
Withdrawn date—
Developer—
Utility / transmission ownerDuke Energy Progress

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-12

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata