PACE Queue Project C1-05 — Other in Millard, Utah

PACE Queue Project C1-05 — Other in Millard, Utah is a 115.0 MW other interconnection project in Millard, Utah with a current status of withdrawn. It is proposed to connect at Blackrock substation.

115.0 MWCapacity
WithdrawnStatus
PACEMarket
OtherTechnology

Project facts

Canonical namePACE Queue Project C1-05 — Other in Millard, Utah
Queue IDC1-05
Statuswithdrawn
Source statusWithdrawn
MarketPACE
TechnologyOther
Capacity115.0 MW
StateUtah
CountyMillard
Point of interconnectionBlackrock substation
Requested (queue) date2021-04-06
Proposed in-service date2026-12-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerPacifiCorp

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: pacificorp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata