PACE Queue Project C1-28 — Solar in Iron, Utah

PACE Queue Project C1-28 — Solar in Iron, Utah is a 199.0 MW solar interconnection project in Iron, Utah with a current status of withdrawn. It is proposed to connect at Three Peaks substation.

199.0 MWCapacity
WithdrawnStatus
PACEMarket
SolarTechnology

Project facts

Canonical namePACE Queue Project C1-28 — Solar in Iron, Utah
Queue IDC1-28
Statuswithdrawn
Source statusWithdrawn
MarketPACE
TechnologySolar
Capacity199.0 MW
StateUtah
CountyIron
Point of interconnectionThree Peaks substation
Requested (queue) date2021-05-07
Proposed in-service date2024-10-15
Operational date
Withdrawn date
Developer
Utility / transmission ownerPacifiCorp

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: pacificorp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata