PACE Queue Project C1-52 — Solar+Battery in Tooele, Utah

PACE Queue Project C1-52 — Solar+Battery in Tooele, Utah is a 250.0 MW solar+battery interconnection project in Tooele, Utah with a current status of withdrawn. It is proposed to connect at Limber substation.

250.0 MWCapacity
WithdrawnStatus
PACEMarket
Solar+BatteryTechnology

Project facts

Canonical namePACE Queue Project C1-52 — Solar+Battery in Tooele, Utah
Queue IDC1-52
Statuswithdrawn
Source statusWithdrawn
MarketPACE
TechnologySolar+Battery
Capacity250.0 MW
StateUtah
CountyTooele
Point of interconnectionLimber substation
Requested (queue) date2021-05-14
Proposed in-service date2024-10-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerPacifiCorp

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: pacificorp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata