PACE Queue Project C2-16 — Battery in Carbon, Utah

PACE Queue Project C2-16 — Battery in Carbon, Utah is a 300.0 MW battery interconnection project in Carbon, Utah with a current status of withdrawn. It is proposed to connect at Emery-Steel Mill transmission line.

300.0 MWCapacity
WithdrawnStatus
PACEMarket
BatteryTechnology

Project facts

Canonical namePACE Queue Project C2-16 — Battery in Carbon, Utah
Queue IDC2-16
Statuswithdrawn
Source statusWithdrawn
MarketPACE
TechnologyBattery
Capacity300.0 MW
StateUtah
CountyCarbon
Point of interconnectionEmery-Steel Mill transmission line
Requested (queue) date2022-04-07
Proposed in-service date2028-06-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerPacifiCorp

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-28

Provenance: pacificorp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata