PACE Queue Project C2-202 — Solar+Battery in Millard, Utah
PACE Queue Project C2-202 — Solar+Battery in Millard, Utah is a 90.0 MW solar+battery interconnection project in Millard, Utah with a current status of withdrawn. It is proposed to connect at Pavant substation.
90.0 MWCapacity
WithdrawnStatus
PACEMarket
Solar+BatteryTechnology
Project facts
| Canonical name | PACE Queue Project C2-202 — Solar+Battery in Millard, Utah |
|---|---|
| Queue ID | C2-202 |
| Status | withdrawn |
| Source status | Withdrawn |
| Market | PACE |
| Technology | Solar+Battery |
| Capacity | 90.0 MW |
| State | Utah |
| County | Millard |
| Point of interconnection | Pavant substation |
| Requested (queue) date | 2022-05-15 |
| Proposed in-service date | 2026-12-15 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | PacifiCorp |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-03 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27
Provenance: pacificorp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata