PACE Queue Project C2-62 — Solar in San Juan, Utah

PACE Queue Project C2-62 — Solar in San Juan, Utah is a 150.0 MW solar interconnection project in San Juan, Utah with a current status of withdrawn. It is proposed to connect at Abajo-Pinto transmission line.

150.0 MWCapacity
WithdrawnStatus
PACEMarket
SolarTechnology

Project facts

Canonical namePACE Queue Project C2-62 — Solar in San Juan, Utah
Queue IDC2-62
Statuswithdrawn
Source statusWithdrawn
MarketPACE
TechnologySolar
Capacity150.0 MW
StateUtah
CountySan Juan
Point of interconnectionAbajo-Pinto transmission line
Requested (queue) date2022-05-10
Proposed in-service date2025-12-15
Operational date
Withdrawn date
Developer
Utility / transmission ownerPacifiCorp

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: pacificorp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.