PACE Queue Project C4-020 — Wind in San Juan, Utah

PACE Queue Project C4-020 — Wind in San Juan, Utah is a 402.0 MW wind interconnection project in San Juan, Utah with a current status of withdrawn. It is proposed to connect at Huntington - Pinto transmission line.

402.0 MWCapacity
WithdrawnStatus
PACEMarket
WindTechnology

Project facts

Canonical namePACE Queue Project C4-020 — Wind in San Juan, Utah
Queue IDC4-020
Statuswithdrawn
Source statusWithdrawn
MarketPACE
TechnologyWind
Capacity402.0 MW
StateUtah
CountySan Juan
Point of interconnectionHuntington - Pinto transmission line
Requested (queue) date2024-05-08
Proposed in-service date2028-06-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerPacifiCorp

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: pacificorp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata