PACE Queue Project C4-083 — Gas in San Juan, Utah

PACE Queue Project C4-083 — Gas in San Juan, Utah is a 525.0 MW gas interconnection project in San Juan, Utah with a current status of withdrawn. It is proposed to connect at Pinto substation.

525.0 MWCapacity
WithdrawnStatus
PACEMarket
GasTechnology

Project facts

Canonical namePACE Queue Project C4-083 — Gas in San Juan, Utah
Queue IDC4-083
Statuswithdrawn
Source statusWithdrawn
MarketPACE
TechnologyGas
Capacity525.0 MW
StateUtah
CountySan Juan
Point of interconnectionPinto substation
Requested (queue) date2024-05-15
Proposed in-service date2028-12-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerPacifiCorp

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: pacificorp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata