PACE Queue Project IS005 — Solar+Battery in Duchesne, Utah

PACE Queue Project IS005 — Solar+Battery in Duchesne, Utah is a 125.0 MW solar+battery interconnection project in Duchesne, Utah with a current status of withdrawn. It is proposed to connect at Ashley Valley - Carbon transmission line.

125.0 MWCapacity
WithdrawnStatus
PACEMarket
Solar+BatteryTechnology

Project facts

Canonical namePACE Queue Project IS005 — Solar+Battery in Duchesne, Utah
Queue IDIS005
Statuswithdrawn
Source statusWithdrawn
MarketPACE
TechnologySolar+Battery
Capacity125.0 MW
StateUtah
CountyDuchesne
Point of interconnectionAshley Valley - Carbon transmission line
Requested (queue) date2018-09-17
Proposed in-service date2023-09-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerPacifiCorp

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: pacificorp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata