PACE Queue Project IS008 — Solar+Battery in Iron, Utah

PACE Queue Project IS008 — Solar+Battery in Iron, Utah is a 1,000.0 MW solar+battery interconnection project in Iron, Utah with a current status of operational. It is proposed to connect at Red Butte-Sigurd #2.

1,000.0 MWCapacity
OperationalStatus
PACEMarket
Solar+BatteryTechnology

Project facts

Canonical namePACE Queue Project IS008 — Solar+Battery in Iron, Utah
Queue IDIS008
Statusoperational
Source statusComplete
MarketPACE
TechnologySolar+Battery
Capacity1,000.0 MW
StateUtah
CountyIron
Point of interconnectionRed Butte-Sigurd #2
Requested (queue) date2022-01-07
Proposed in-service date—
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerPacifiCorp

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_project—operationalhigh

Explore related data

Source last checked2026-10-05
Data last materially changed2026-10-05
Page data generated2026-10-11

Provenance: pacificorp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata