PACE Queue Project IS010 — Solar in Box Elder, Utah

PACE Queue Project IS010 — Solar in Box Elder, Utah is a 150.0 MW solar interconnection project in Box Elder, Utah with a current status of operational. It is proposed to connect at Washakie substation.

150.0 MWCapacity
OperationalStatus
PACEMarket
SolarTechnology

Project facts

Canonical namePACE Queue Project IS010 — Solar in Box Elder, Utah
Queue IDIS010
Statusoperational
Source statusComplete
MarketPACE
TechnologySolar
Capacity150.0 MW
StateUtah
CountyBox Elder
Point of interconnectionWashakie substation
Requested (queue) date2022-02-25
Proposed in-service date
Operational date2026-12-31
Withdrawn date
Developer
Utility / transmission ownerPacifiCorp

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectoperationalhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-28

Provenance: pacificorp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata