PACE Queue Project IS010 — Solar in Box Elder, Utah
PACE Queue Project IS010 — Solar in Box Elder, Utah is a 150.0 MW solar interconnection project in Box Elder, Utah with a current status of operational. It is proposed to connect at Washakie substation.
150.0 MWCapacity
OperationalStatus
PACEMarket
SolarTechnology
Project facts
| Canonical name | PACE Queue Project IS010 — Solar in Box Elder, Utah |
|---|---|
| Queue ID | IS010 |
| Status | operational |
| Source status | Complete |
| Market | PACE |
| Technology | Solar |
| Capacity | 150.0 MW |
| State | Utah |
| County | Box Elder |
| Point of interconnection | Washakie substation |
| Requested (queue) date | 2022-02-25 |
| Proposed in-service date | — |
| Operational date | 2026-12-31 |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | PacifiCorp |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-03 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-28
Provenance: pacificorp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.