PACE Queue Project IS013 — Solar+Battery in Iron, Utah

PACE Queue Project IS013 — Solar+Battery in Iron, Utah is a 200.0 MW solar+battery interconnection project in Iron, Utah with a current status of withdrawn. It is proposed to connect at West Cedar.

200.0 MWCapacity
WithdrawnStatus
PACEMarket
Solar+BatteryTechnology

Project facts

Canonical namePACE Queue Project IS013 — Solar+Battery in Iron, Utah
Queue IDIS013
Statuswithdrawn
Source statusWithdrawn
MarketPACE
TechnologySolar+Battery
Capacity200.0 MW
StateUtah
CountyIron
Point of interconnectionWest Cedar
Requested (queue) date2024-02-23
Proposed in-service date2028-01-01
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerPacifiCorp

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_project—withdrawnhigh

Explore related data

Source last checked2026-10-12
Data last materially changed2026-10-12
Page data generated2026-10-12

Provenance: pacificorp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata