PACE Queue Project IS018 — Other in Tooele, Utah

PACE Queue Project IS018 — Other in Tooele, Utah is a 1,000.0 MW other interconnection project in Tooele, Utah with a current status of operational. It is proposed to connect at Horseshoe substation.

1,000.0 MWCapacity
OperationalStatus
PACEMarket
OtherTechnology

Project facts

Canonical namePACE Queue Project IS018 — Other in Tooele, Utah
Queue IDIS018
Statusoperational
Source statusComplete
MarketPACE
TechnologyOther
Capacity1,000.0 MW
StateUtah
CountyTooele
Point of interconnectionHorseshoe substation
Requested (queue) date2025-02-25
Proposed in-service date
Operational date2030-12-01
Withdrawn date
Developer
Utility / transmission ownerPacifiCorp

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectoperationalhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: pacificorp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata