PACE Queue Project S0034 — Battery in Juab, Utah
PACE Queue Project S0034 — Battery in Juab, Utah is a 80.0 MW battery interconnection project in Juab, Utah with a current status of active. It is proposed to connect at Mona substation.
80.0 MWCapacity
ActiveStatus
PACEMarket
BatteryTechnology
Project facts
| Canonical name | PACE Queue Project S0034 — Battery in Juab, Utah |
|---|---|
| Queue ID | S0034 |
| Status | active |
| Source status | In Progress |
| Market | PACE |
| Technology | Battery |
| Capacity | 80.0 MW |
| State | Utah |
| County | Juab |
| Point of interconnection | Mona substation |
| Requested (queue) date | 2024-12-18 |
| Proposed in-service date | 2029-06-19 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | PacifiCorp |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-03 | new_project | — | active | high |
Explore related data
Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27
Provenance: pacificorp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata