PACE Queue Project S0035 — Gas in Washington, Utah

PACE Queue Project S0035 — Gas in Washington, Utah is a 300.0 MW gas interconnection project in Washington, Utah with a current status of active. It is proposed to connect at Red Butte – Three Peaks – Sigurd transmission line.

300.0 MWCapacity
ActiveStatus
PACEMarket
GasTechnology

Project facts

Canonical namePACE Queue Project S0035 — Gas in Washington, Utah
Queue IDS0035
Statusactive
Source statusIn Progress
MarketPACE
TechnologyGas
Capacity300.0 MW
StateUtah
CountyWashington
Point of interconnectionRed Butte – Three Peaks – Sigurd transmission line
Requested (queue) date2025-04-01
Proposed in-service date2027-12-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerPacifiCorp

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectactivehigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: pacificorp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.