PACE Queue Project T2-023 — Solar+Battery in Juab, Utah

PACE Queue Project T2-023 — Solar+Battery in Juab, Utah is a 275.0 MW solar+battery interconnection project in Juab, Utah with a current status of active. It is proposed to connect at Mona substation.

275.0 MWCapacity
ActiveStatus
PACEMarket
Solar+BatteryTechnology

Project facts

Canonical namePACE Queue Project T2-023 — Solar+Battery in Juab, Utah
Queue IDT2-023
Statusactive
Source statusIn Progress
MarketPACE
TechnologySolar+Battery
Capacity275.0 MW
StateUtah
CountyJuab
Point of interconnectionMona substation
Requested (queue) date2025-09-04
Proposed in-service date2026-12-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerPacifiCorp

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectactivehigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: pacificorp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata