PACE Queue Project T2-053 — Solar+Battery in Iron, Utah

PACE Queue Project T2-053 — Solar+Battery in Iron, Utah is a 248.0 MW solar+battery interconnection project in Iron, Utah with a current status of active. It is proposed to connect at Holt substation.

248.0 MWCapacity
ActiveStatus
PACEMarket
Solar+BatteryTechnology

Project facts

Canonical namePACE Queue Project T2-053 — Solar+Battery in Iron, Utah
Queue IDT2-053
Statusactive
Source statusIn Progress
MarketPACE
TechnologySolar+Battery
Capacity248.0 MW
StateUtah
CountyIron
Point of interconnectionHolt substation
Requested (queue) date2025-09-12
Proposed in-service date2029-12-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerPacifiCorp

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectactivehigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-28

Provenance: pacificorp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata