PACE Queue Project T2-075 — Battery in San Juan, Utah

PACE Queue Project T2-075 — Battery in San Juan, Utah is a 300.0 MW battery interconnection project in San Juan, Utah with a current status of active. It is proposed to connect at Pinto substation.

300.0 MWCapacity
ActiveStatus
PACEMarket
BatteryTechnology

Project facts

Canonical namePACE Queue Project T2-075 — Battery in San Juan, Utah
Queue IDT2-075
Statusactive
Source statusIn Progress
MarketPACE
TechnologyBattery
Capacity300.0 MW
StateUtah
CountySan Juan
Point of interconnectionPinto substation
Requested (queue) date2025-09-12
Proposed in-service date2027-12-31
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerPacifiCorp

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_project—activehigh

Explore related data

Source last checked2026-10-05
Data last materially changed2026-10-05
Page data generated2026-10-11

Provenance: pacificorp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata