PACHECO PASS WIND ENERGY CENTER (643)

PACHECO PASS WIND ENERGY CENTER is a 149.5 MW wind interconnection project in Fresno, California with a current status of withdrawn. It is proposed to connect at Los Banos-San Luis PGP #1 230 kV.

149.5 MWCapacity
WithdrawnStatus
Market
WindTechnology

Project facts

Canonical namePACHECO PASS WIND ENERGY CENTER
Queue ID643
Statuswithdrawn
Source statusWITHDRAWN
Market
TechnologyWind
Capacity149.5 MW
StateCalifornia
CountyFresno
Point of interconnectionLos Banos-San Luis PGP #1 230 kV
Requested (queue) date2010-07-31
Proposed in-service date
Operational date
Withdrawn date2011-09-02
Developer
Utility / transmission ownerPGAE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.