PACW Queue Project C2-203 — Solar+Battery in Klamath, Oregon is a 400.0 MW solar+battery interconnection project in Klamath, Oregon with a current status of active. It is proposed to connect at Klamath CoGen-Meridian transmission line.

400.0 MWCapacity
ActiveStatus
PACWMarket
Solar+BatteryTechnology

Project facts

Canonical namePACW Queue Project C2-203 — Solar+Battery in Klamath, Oregon
Queue IDC2-203
Statusactive
Source statusIn Progress
MarketPACW
TechnologySolar+Battery
Capacity400.0 MW
StateOregon
CountyKlamath
Point of interconnectionKlamath CoGen-Meridian transmission line
Requested (queue) date2022-05-15
Proposed in-service date2025-12-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerPacifiCorp

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectactivehigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-28

Provenance: pacificorp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata