PACW Queue Project C2-41 — Solar+Battery in Asotin, Washington

PACW Queue Project C2-41 — Solar+Battery in Asotin, Washington is a 160.0 MW solar+battery interconnection project in Asotin, Washington with a current status of withdrawn. It is proposed to connect at Talbot substation.

160.0 MWCapacity
WithdrawnStatus
PACWMarket
Solar+BatteryTechnology

Project facts

Canonical namePACW Queue Project C2-41 — Solar+Battery in Asotin, Washington
Queue IDC2-41
Statuswithdrawn
Source statusWithdrawn
MarketPACW
TechnologySolar+Battery
Capacity160.0 MW
StateWashington
CountyAsotin
Point of interconnectionTalbot substation
Requested (queue) date2022-04-28
Proposed in-service date2025-12-31
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerPacifiCorp

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_project—withdrawnhigh

Explore related data

Source last checked2026-11-23
Data last materially changed2026-11-23
Page data generated2026-11-26

Provenance: pacificorp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata