PACW Queue Project C3-148 — Solar in Crook, Oregon

PACW Queue Project C3-148 — Solar in Crook, Oregon is a 3.0 MW solar interconnection project in Crook, Oregon with a current status of withdrawn. It is proposed to connect at Circuit 5D126 out of Prineville substation.

3.0 MWCapacity
WithdrawnStatus
PACWMarket
SolarTechnology

Project facts

Canonical namePACW Queue Project C3-148 — Solar in Crook, Oregon
Queue IDC3-148
Statuswithdrawn
Source statusWithdrawn
MarketPACW
TechnologySolar
Capacity3.0 MW
StateOregon
CountyCrook
Point of interconnectionCircuit 5D126 out of Prineville substation
Requested (queue) date2023-05-15
Proposed in-service date2033-12-02
Operational date
Withdrawn date
Developer
Utility / transmission ownerPacifiCorp

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-28

Provenance: pacificorp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata