PACW Queue Project C4-014 — Solar in Multnomah, Oregon
PACW Queue Project C4-014 — Solar in Multnomah, Oregon is a 1.8 MW solar interconnection project in Multnomah, Oregon with a current status of withdrawn. It is proposed to connect at Circuit 5P478 out of Columbia substation.
1.8 MWCapacity
WithdrawnStatus
PACWMarket
SolarTechnology
Project facts
| Canonical name | PACW Queue Project C4-014 — Solar in Multnomah, Oregon |
|---|---|
| Queue ID | C4-014 |
| Status | withdrawn |
| Source status | Withdrawn |
| Market | PACW |
| Technology | Solar |
| Capacity | 1.8 MW |
| State | Oregon |
| County | Multnomah |
| Point of interconnection | Circuit 5P478 out of Columbia substation |
| Requested (queue) date | 2024-05-06 |
| Proposed in-service date | 2026-09-01 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | PacifiCorp |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-03 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27
Provenance: pacificorp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.