PACW Queue Project C4-120 — Solar in Jefferson, Oregon

PACW Queue Project C4-120 — Solar in Jefferson, Oregon is a 3.0 MW solar interconnection project in Jefferson, Oregon with a current status of withdrawn. It is proposed to connect at Circuit 5D295 out of Cherry Lane substation.

3.0 MWCapacity
WithdrawnStatus
PACWMarket
SolarTechnology

Project facts

Canonical namePACW Queue Project C4-120 — Solar in Jefferson, Oregon
Queue IDC4-120
Statuswithdrawn
Source statusWithdrawn
MarketPACW
TechnologySolar
Capacity3.0 MW
StateOregon
CountyJefferson
Point of interconnectionCircuit 5D295 out of Cherry Lane substation
Requested (queue) date2024-05-13
Proposed in-service date2025-12-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerPacifiCorp

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-28

Provenance: pacificorp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata