PACW Queue Project FT021 — Solar in Klamath, Oregon

PACW Queue Project FT021 — Solar in Klamath, Oregon is a 2.0 MW solar interconnection project in Klamath, Oregon with a current status of withdrawn. It is proposed to connect at Circuit 5L112 out of Texum substation.

2.0 MWCapacity
WithdrawnStatus
PACWMarket
SolarTechnology

Project facts

Canonical namePACW Queue Project FT021 — Solar in Klamath, Oregon
Queue IDFT021
Statuswithdrawn
Source statusWithdrawn
MarketPACW
TechnologySolar
Capacity2.0 MW
StateOregon
CountyKlamath
Point of interconnectionCircuit 5L112 out of Texum substation
Requested (queue) date2025-07-17
Proposed in-service date2026-12-07
Operational date
Withdrawn date
Developer
Utility / transmission ownerPacifiCorp

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: pacificorp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata