PACW Queue Project FT021 — Solar in Klamath, Oregon
PACW Queue Project FT021 — Solar in Klamath, Oregon is a 2.0 MW solar interconnection project in Klamath, Oregon with a current status of withdrawn. It is proposed to connect at Circuit 5L112 out of Texum substation.
2.0 MWCapacity
WithdrawnStatus
PACWMarket
SolarTechnology
Project facts
| Canonical name | PACW Queue Project FT021 — Solar in Klamath, Oregon |
|---|---|
| Queue ID | FT021 |
| Status | withdrawn |
| Source status | Withdrawn |
| Market | PACW |
| Technology | Solar |
| Capacity | 2.0 MW |
| State | Oregon |
| County | Klamath |
| Point of interconnection | Circuit 5L112 out of Texum substation |
| Requested (queue) date | 2025-07-17 |
| Proposed in-service date | 2026-12-07 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | PacifiCorp |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-03 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27
Provenance: pacificorp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata