PACW Queue Project FT032 — Battery in Multnomah, Oregon

PACW Queue Project FT032 — Battery in Multnomah, Oregon is a 1.9 MW battery interconnection project in Multnomah, Oregon with a current status of withdrawn. It is proposed to connect at Circuit 5P474 out of Columbia substation.

1.9 MWCapacity
WithdrawnStatus
PACWMarket
BatteryTechnology

Project facts

Canonical namePACW Queue Project FT032 — Battery in Multnomah, Oregon
Queue IDFT032
Statuswithdrawn
Source statusWithdrawn
MarketPACW
TechnologyBattery
Capacity1.9 MW
StateOregon
CountyMultnomah
Point of interconnectionCircuit 5P474 out of Columbia substation
Requested (queue) date2025-12-02
Proposed in-service date—
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerPacifiCorp

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_project—withdrawnhigh

Explore related data

Source last checked2026-10-12
Data last materially changed2026-10-12
Page data generated2026-10-12

Provenance: pacificorp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata