PACW Queue Project T2-008 — Solar+Battery in Morrow, Oregon

PACW Queue Project T2-008 — Solar+Battery in Morrow, Oregon is a 500.0 MW solar+battery interconnection project in Morrow, Oregon with a current status of active. It is proposed to connect at Apex substation.

500.0 MWCapacity
ActiveStatus
PACWMarket
Solar+BatteryTechnology

Project facts

Canonical namePACW Queue Project T2-008 — Solar+Battery in Morrow, Oregon
Queue IDT2-008
Statusactive
Source statusIn Progress
MarketPACW
TechnologySolar+Battery
Capacity500.0 MW
StateOregon
CountyMorrow
Point of interconnectionApex substation
Requested (queue) date2025-08-26
Proposed in-service date2028-12-31
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerPacifiCorp

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_project—activehigh

Explore related data

Source last checked2026-10-05
Data last materially changed2026-10-05
Page data generated2026-10-11

Provenance: pacificorp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata