PACW Queue Project T2-009 — Solar+Battery in Umatilla, Oregon

PACW Queue Project T2-009 — Solar+Battery in Umatilla, Oregon is a 20.0 MW solar+battery interconnection project in Umatilla, Oregon with a current status of withdrawn. It is proposed to connect at Pendleton-McNary transmission line.

20.0 MWCapacity
WithdrawnStatus
PACWMarket
Solar+BatteryTechnology

Project facts

Canonical namePACW Queue Project T2-009 — Solar+Battery in Umatilla, Oregon
Queue IDT2-009
Statuswithdrawn
Source statusWithdrawn
MarketPACW
TechnologySolar+Battery
Capacity20.0 MW
StateOregon
CountyUmatilla
Point of interconnectionPendleton-McNary transmission line
Requested (queue) date2025-08-27
Proposed in-service date2027-12-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerPacifiCorp

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: pacificorp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.