PACW Queue Project T2-072 — Battery in Siskiyou, California

PACW Queue Project T2-072 — Battery in Siskiyou, California is a 150.0 MW battery interconnection project in Siskiyou, California with a current status of active. It is proposed to connect at Copco substation.

150.0 MWCapacity
ActiveStatus
PACWMarket
BatteryTechnology

Project facts

Canonical namePACW Queue Project T2-072 — Battery in Siskiyou, California
Queue IDT2-072
Statusactive
Source statusIn Progress
MarketPACW
TechnologyBattery
Capacity150.0 MW
StateCalifornia
CountySiskiyou
Point of interconnectionCopco substation
Requested (queue) date2025-09-12
Proposed in-service date2027-12-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerPacifiCorp

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectactivehigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: pacificorp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata