Padua 1 (68912_12341)

Padua 1 is a 50.0 MW battery interconnection project in Bexar, Texas with a current status of operational.

50.0 MWCapacity
OperationalStatus
ERCOMarket
BatteryTechnology

Project facts

Canonical namePadua 1
Queue ID68912_12341
Statusoperational
Source status(OP) Operating
MarketERCO
TechnologyBattery
Capacity50.0 MW
StateTexas
CountyBexar
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2025-07-01
Withdrawn date—
Developer—
Utility / transmission ownerPadua 1

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-11-01
Data last materially changed2026-11-01
Page data generated2026-11-26

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.