Padua Grid BESS Unit 3 (28INR0024)

Padua Grid BESS Unit 3 is a 201.3 MW other interconnection project in Bexar, Texas with a current status of operational. It is proposed to connect at Tap #5395 O.W Sommer 138kV.

201.3 MWCapacity
OperationalStatus
BexarMarket
OtherTechnology

Project facts

Canonical namePadua Grid BESS Unit 3
Queue ID28INR0024
Statusoperational
Source statusSS Completed, FIS Completed, IA
MarketBexar
TechnologyOther
Capacity201.3 MW
StateTexas
CountyBexar
Point of interconnectionTap #5395 O.W Sommer 138kV
Requested (queue) date2024-03-22
Proposed in-service date
Operational date2026-05-15
Withdrawn date
DeveloperPadua Grid 3, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata